top of page

How long does it take to have a new tap set?

 

On Side Tap:   If the tap is on the same side of the road as the water main it can be set when all necessary paper work is filed in our office, your driveway is completed and when all other utilities are marked in the area. This typically takes 1 to 2 weeks.

 

Off Side Tap:   If the tap is on the opposite side of the road than the water main it can be set as soon as all the proper paper work is filed in our office, your driveway is completed, a county/state road bore permit is obtained by BCRWA and the other utilities in the area are marked.  This typically takes 3 to 4 weeks.

bottom of page